Aerisa AerBrush 01 설치, 운영 및 유지보수 매뉴얼 - 페이지 4

{카테고리_이름} Aerisa AerBrush 01에 대한 설치, 운영 및 유지보수 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Aerisa AerBrush 01 4 페이지.

Aerisa AerBrush 01 설치, 운영 및 유지보수 매뉴얼
SEQUENCE OF OPERATION
1. For units that are interlocked with the supply fan control, the BAS controls the start/stop of the air
conditioning unit supply fan.
INSTALLATION INSTRUCTIONS FOR OPTIONAL DRY CONTACTS
The AerBrush unt has an option to include dry contacts which will indicate ionizer functionality to a BAS
(Building Automation System).
1. All field wiring to be in accordance with NEC and Authorities Having Jurisdiction (AHJ).
2. Connect power to ionizer using appropriate voltage per the following. See figure 4.
AerBrush-01=12V DC
AerBrush-02=24V AC
AerBrush-03=120V AC
AerBrush-04=230V AC
3. For 120V AC and 230V AC models the installer shall provide a grounding method per the local AHJ.
4. For best results interlock ionizer with fan relay.
5. Apply power to unit. Confirm that green indicator light illuminates and that the dry contacts indicate
that the ionizer is functioning properly.
MAINTENANCE
Given good particulate filter maintenance, there is no maintenance required on the AerBrush unit.
Aerisa
1214 W. Boston Post Road, Suite 410, Mamaroneck, NY 10543
Tel: 480-302-6300
www.aerisa.com