ClearCube R2200 사이트 준비 매뉴얼 - 페이지 9

{카테고리_이름} ClearCube R2200에 대한 사이트 준비 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ClearCube R2200 9 페이지. Delayed start-up when cmos battery
ClearCube R2200에 대해서도 마찬가지입니다: 기술 문서 (1 페이지), 릴리스 노트 (1 페이지), 빠른 시작 매뉴얼 (2 페이지), 기술 노트 (1 페이지)

ClearCube R2200 사이트 준비 매뉴얼
require static IP addresses and some can be configured in static or DHCP mode.
installation, the network administrator must assign static IP addresses to the RMMs or ensure
that a DHCP server is available for models that support DHCP. This also means each RMM will
require a physical network connection.
CONCLUSION
The ClearCube solution represents a revolutionary step forward in efficient and cost-effective
business computing. However, because it does reverse the trend of distributed computational
power, installation can present unique challenges. Adherence to the guidelines set out in this
paper and summarized in the
installation and subsequent usage.
customer's IT department and end-users.
ClearCube has a Professional Services group to assist customers
with installation of its equipment, including pre-installation site
surveys. ClearCube Professional Services will work with clients to
resolve any site or software issues and ensure compliance with
installation guidelines.
Executive or visit the ClearCube Professional Services home page
at
www.clearcube.com/controller/services.php
information.
ClearCube Site Preparation Checklist
This will result in a positive experience for both the
ClearCube Professional Services
Please contact your ClearCube Account
9
During
will ensure a trouble-free
for
more