Clearfield FieldSmart 48 설치 매뉴얼 - 페이지 8

{카테고리_이름} Clearfield FieldSmart 48에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Clearfield FieldSmart 48 18 페이지. Fiber distribution point (fdp) port outdoor wall box

FieldSmart
24 & 48 Port Outdoor Wall Box
Installation Manual
4.
Ensure the O-ring on the underside of the sealcon is present before
installation.
5.
The sealcon can then be installed by inserting the thread through the bottom of the wall box and securing with the
included lock nut. (Figure 1)
Note: The optional strength member clamp is shown in this picture.
6.
The stripped cable can then be inserted into the sealcon. (Figure 2)
Note: If utilizing the strength member clamp, leave enough strength member after prepping cable to trim to length and
tighten into the clamp securely.
8
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
Fiber Distribution Point (FDP)
®
______________________________________________________
Figure 1
Manual 020012 REV A - Aug 2018
O-Ring
Figure 2