ESI LIFT-WB-SLV 조립 지침 매뉴얼 - 페이지 3
{카테고리_이름} ESI LIFT-WB-SLV에 대한 조립 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ESI LIFT-WB-SLV 6 페이지.
ASSEMBLY
Position the Main Assembly on the Work Surface
• The work surface must be a minimum of
24" in depth.
WARNING: Do not allow the base
to hang over the edge of the work
surface!
Attach Paddle
Holes for the activating paddle are pre-drilled into the top platform on both the left and right sides. You
may attach the paddle on either side, depending on user preference.
• Use the 4mm Allen key to fasten the paddle to the top platform.
24"
Minimum
Top Platform
Paddle
LIFT-WB
3