ClearSpan 105366 매뉴얼 - 페이지 11
{카테고리_이름} ClearSpan 105366에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ClearSpan 105366 13 페이지.
4
INSTALL FILM END PANELS (continued)
8. Next, secure the flaps to the U-channel located
inside of the door frame using 102198 spring wire.
Trim edges if needed.
DO NOT REMOVE TOO MUCH OF THE EXCESS
FILM MATERIAL. Some excess end film material–
the material that extends beyond the U-channel–
should remain in place so the film can be stretched if
needed.
END PANEL
DOOR JAMB
102197
FA4482B
102198
Dashed line marks the edge of the film
once it is installed.
Revision date: 04.01.10
102197
U-channel
installed to
the outside
edge of jamb.
U-channel
Drawings may show a different but similar model.
Outside of Shelter
TOP VIEW
HEADER
Inside of Shelter
Ground Level
Diagram shows the end wall and end
panel as seen from inside the shelter.
CLEARSPAN
END FRAME KIT
™
Inside View
Edge
102197
Tek
screw
END PANEL
DOOR JAMB
FA4482B
102198
102197
102198
11