ClearSpan Premium Solar Star 104918 조립 지침 매뉴얼 - 페이지 7
{카테고리_이름} ClearSpan Premium Solar Star 104918에 대한 조립 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ClearSpan Premium Solar Star 104918 17 페이지. Home-attached greenhouse
View shows the inside of frame.
HINT: When installing panels, use a clamp at the top
and bottom corners (when possible) to clamp the panels
together before installing the flat brackets.
6. Position a pass-through connector in the locations
shown below, move to the remaining front corner
and install another angled panel and small, front
panel as shown below and secure these as before.
Pass-Through
Connector
NOTE: The raised portion of the pass-through connector
is positioned to the inside of the greenhouse.
DO NOT SECURE ANY PASS-THROUGH CONNECTORS
TO THE METAL BASE FRAME AT THIS TIME.
Visit www.ClearSpan.com for additional products and customer assistance.
Front Panel
7. Choose the remaining front panel, set it in place,
and install a 3" x 3" square plate on the inside to
secure the panel seams.
NOTE: Adjust the frame tubes as needed to allow the
panels to fit properly.
8. Position another pass-through connector on the
frame rail (see arrow below) and set the rectangular
end panel in place as shown.
9. Secure the panel to the corner bracket only.
10. Set the final panel for the non-door end in position
and secure it to the adjacent panels using pass-
through connectors and 3" x 3" flat plates.
Brace panel
if needed.
6 of 16