Artic AR-SC7P-48F-M 설치 매뉴얼 - 페이지 6

{카테고리_이름} Artic AR-SC7P-48F-M에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Artic AR-SC7P-48F-M 16 페이지. Horizontal fiber optic splice closure

4. Installation flow chart
Splice fiber and pigtail
7.
Install heat shrinkable protective sleeve and house fibers
8.
Separate fiber cores and prepare work prior to fixing fiber cable
9.
Check up comprehensively
10.
Assemble FOSC housing and fix FOSC
11.
5. The process of installing FOSC
5.1  Step one-Open the closure
Cleaning the locale and determine where to install the FOSC and then place fiber cables 
required. Check whether the main components and accessories have been well prepared 
inside the package.
Open the closure
 
1- Demount  hoop  fixing  bolt  and  pull  hoop  locking  system  out,  then  proceed  in  
 
demounting the hoop. 
 
2- Pull the FOSC cover upwards out, installation could begin. See Drawing 1
INSTALLATION MANUAL HORIZONTAL FIBER OPTIC SPLICE CLOSURE AR-SC7P-xxxF-M
6