Akku Vision TEST TOWER 매뉴얼/안전 수칙 - 페이지 15
{카테고리_이름} Akku Vision TEST TOWER에 대한 매뉴얼/안전 수칙을 온라인으로 검색하거나 PDF를 다운로드하세요. Akku Vision TEST TOWER 15 페이지.
Akku Vision TEST TOWER에 대해서도 마찬가지입니다: 빠른 시작 매뉴얼 (2 페이지)
LED-view
LED 1 LED 2 LED 3 LED 4 LED 5
Betätigen Sie den Ein-/Aus Taster, um das Gerät in den Standby-Modus zu versetzen.
LED 1 flashing:
LED 1, 2, 3, 4 and 5 flashing:
LED 1, 2, 3, 4 and 5 on:
Descending LED-view
from LED 5 to LED 1:
Maintenance and servicing
If your drive system can not be activated, please check the contacts of the discharge plug to make sure that they are
clean, straight and undamaged and that there is a safe contact between battery and connector box.
If the drive system can still not be activated, please try to charge your battery.
If charging does not start, please check the polarity of the charge plug.
Please test the battery by pushing the capacity indicator button.
Is the power cord of the charger connected properly and performs the wallet socket?
If the battery is damaged, defective or exits any liquids or smell? Please do not use your E-Bike Vision Battery further
and contact your dealer or our service center.
Disposal
Electrical equipment marked with the cancelled waste bin symbol must not be discarded in the
standard household waste; instead it must be taken to a suitable specialist disposal system.
Datum 2023-10-27
Index 03
Software error – Update necessary
Akku Vision Test Tower is not connected to the Software via PC
Akku Vision Test Tower is connected Software via PC
Discharging test running
Akku Vision - Manual Akku Vision Test Tower
S. 15 / 15