Artillian 1RMFCH 설치 및 사용 설명서 - 페이지 2

{카테고리_이름} Artillian 1RMFCH에 대한 설치 및 사용 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. Artillian 1RMFCH 6 페이지. Artillian rops mounted fuel can holder

Pass through slots
for hold-downs
E-Track
Mounting Slots
Fig. 1a (mounting point option 1)
SET-UP
1. The design features include many E-Track slots,
bungee cord holes, splitting/felling wedge slots,
several pass through slots for hold-down straps
and various mounting hole locations for a U-bolt.
See figs. 1a, b, & c.
2. Based on the size of your fuel and bar oil cans,
locate the best E-track slots that will securely hold
these items. Install the fixed end of the hold-down
strap first. To install the E-track fitting, pull the
release lever towards the cam buckle, hook the
release lever end of the fitting into the mount and
then insert the other end. Release the lever. See
figs. 2a & b.
Fig. 2b (fixed end of hold-down strap installed)
SET-UP
Bungee Cord
Bungee Cord
Holes
U-Bolt
Mounting Holes
Fig. 2a (install fixed end of hold-down strap)
Holes
Pass throughs slots
for hold-downs
Fig. 1b (mounting point option 2)
Splitting & Felling
Wedge Slots
Pass through slots
for hold-downs
Fig. 1c (wedge mount locations)
Hook this end
first
Pull back lever
2 of 6
E-Track
Mounting Slots
Cam buckle