Altusen ALTUSEN PN9108 빠른 시작 매뉴얼
{카테고리_이름} Altusen ALTUSEN PN9108에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Altusen ALTUSEN PN9108 2 페이지. 8-port over the net
Altusen ALTUSEN PN9108에 대해서도 마찬가지입니다: 사양 (1 페이지)
Online Registration
International:
Power over the NET (PN9108 / PN9108U)
• http://support.aten.com
North America:
QUICK START GUIDE
• http://www.aten-usa.com/product_registration
Technical Phone Support
International:
®
© Copyright 2011 ATEN
International Co., Ltd. www.aten.com
• 886-2-8692-6959
China:
Altusen and the Altusen logo are trademarks of ATEN International Co., Ltd.
• 86-10-5255-0110
All rights reserved. All other trademarks are the property of their respective owners.
Japan:
PAPE-1214-B01G
Printing Date: 06/2011
This product is RoHS compliant
• 81-3-5615-5811
Korea:
• 82-2-467-6789
North America:
Patent No.
• 1-888-999-ATEN Ext: 4988
CN ZL 200420007513.7
United Kingdom:
DE 202004005510.4
• 44-8-4481-58923
TW M253187
US 6909609
All information, documentation, and specifications contained in this media are subject to change without prior notification by the manufacturer.
Please visit our website to find the most up to date version.
1
Package Contents
The complete package consists of:
• 1 PN9108 Station
• 1 PN9108 to AC Source Power Cord (1.8M)
• 8 Power Outlet Power Cords
• 8 Safe Shutdown Cables
• 1 PON Cable (DB9 F to DB9 M)
• 4 Foot Pads
• 1 Rack mount kit
(Brackets and Philips Head Hex M3 x 8 Screws)
• 1 User Manual
• 1 Quick Start Guide
• 1 Software Disk
These instructions show how to install the PN9108 Power over the NET. For detailed
information, refer to the user manual included in the kit.
Power cord : The power source is a 220- 240 V AC supply, use a tandem (T blade) type
attachment plug with ground conductor power cord that meets the respective European
country's safety regulations, such as VDE for Germany. Plug should comply with the VDE
0620 specification; the connector should comply with the VDE 0625 specification. A
minimum 10A, 0.75 mm2 x 3G power cord (H05VV-F or VW-1) should be used.
Power outlet cord : Connector should comply with the VDE 0625 or EN60320
specification. A minimum 10A, 0.75 mm2 x 3G power cord (H05VV-F or VW-1) should
be used.
Note:
Use the power cord supplied with this package. If you need to purchase additional
power cord, you must choose ones that comply with the above specifications.
2
The PN9108 Unit ( Front View )
1. Port LEDs
6. Power Control Buttons
2. Current LED
7. Current Display Switch
3. Station ID LED
8. Reset Switch
4. 10/100 Mbps Data LED
9. Link LED
5. Power LED
2 3
1
6
7
3
The PN9108 Unit ( Rear View )
1. Power Socket
6. PON (Power over the NET) Output Port
2. Circuit Breaker
7. Power Switch
3. AC Power Outlets
8. RJ-45 Port
4. RS-232 Port
9. PON Input Port
5. Safe Shutdown Ports
1
2
3
4
7
8
4
Single Stage Installation
1. For each computer, use an AC Output cable to connect from any available PN9108 output
port to the computer's AC socket.
2. For Windows 98E, ME, NT, 2000, XP, and 2003 Server computers, for each computer
use a Safe Shutdown cable to connect from the PN9108's Safe Shutdown port to the
computer's Serial port.
3. Plug the LAN or WAN cable into the PN9108's RJ-45 socket.
4-1
Single Stage Installation
4. Use the AC power cord provided with this package to connect the PN9108's Power
Socket to an AC power source.
5. Turn on the PN9108.
6. Turn on the computers.
4 5
5
8 9
5
Daisy Chaining Installation
To manage even more computers, up to 15 additional PN9108 Stations can be daisy
5
6
chained down from the top level unit. In this way, up to 128 computers can be managed
on a complete installation.
In a daisy chained installation, a switch is the child of the switch above it, and the
Note:
parent of the switch below.
9
1
2
3