Aluma Tower Company TM51-35 사용 설명서 - 페이지 6

{카테고리_이름} Aluma Tower Company TM51-35에 대한 사용 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. Aluma Tower Company TM51-35 12 페이지. Tower setup with guy wires includes guying to outriggers

Aluma Tower Company TM51-35 사용 설명서
6.
ERECTING THE TOWER AT FULL HEIGHT
1. While the tower is still in the horizontal position, loosen and remove the hold
down restraining cables that hold the tower in place for transporting. These cables
are located on the front support of the trailer and/or shelter(see Fig. 7).
NOTE: There may be more than one hold down cable at varying locations,
depending on your specific model.
2/13/2012
Fig. 6 Proper Guy Wire Configuration
IMPORTANT! Check winch cable and insure the cable is
properly seated on each pulley sheave. Using the winch, apply
tension to the winch cable BEFORE tilting to the vertical
position. This will keep the cable properly seated on the sheave
and keep the pulleys from being damaged.
Fig. 7 Trailer Tower Component Locations
Page 5
TRAILER TOWER SETUP INSTRUCTIONS-GUYED TO OUTRIGGERS