Artos F907-29 설치 매뉴얼 - 페이지 4
{카테고리_이름} Artos F907-29에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Artos F907-29 10 페이지. Bidet handshower kit
⃞
Determine the position of the finished wall surface.
⃞
If Artos service stop valves are being used, install into valve using a
permanent adhesive sealant to allow the screwdriver slot to face the
front of the valve. (see Fig C)
⃞
Connect hot and cold supply pipes to the valve observing the mini-
mum and maximum dimensions from the pipe center to the finished
wall surface. (see Fig B)
⃞
Ensure that the valve is upright and level then secure to the stud
work.
⃞
Connect pipe from the F902-12 water outlet to the mixed water
valve outlet
⃞
Provide a 2-3/8" hole in the wall material. If Artos service stop
valves have been fitted, first make 1" holes in wall for accessibility
(see Fig D)
907290712