Artos F907-29 설치 매뉴얼 - 페이지 4

{카테고리_이름} Artos F907-29에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Artos F907-29 10 페이지. Bidet handshower kit

Determine the position of the finished wall surface.
If Artos service stop valves are being used, install into valve using a
permanent adhesive sealant to allow the screwdriver slot to face the
front of the valve. (see Fig C)
Connect hot and cold supply pipes to the valve observing the mini-
mum and maximum dimensions from the pipe center to the finished
wall surface. (see Fig B)
Ensure that the valve is upright and level then secure to the stud
work.
Connect pipe from the F902-12 water outlet to the mixed water
valve outlet
Provide a 2-3/8" hole in the wall material. If Artos service stop
valves have been fitted, first make 1" holes in wall for accessibility
(see Fig D)
907290712

INSTALL THE VALVE