ALUZ A8-ZIZA-SOP 설치 지침 매뉴얼 - 페이지 9
{카테고리_이름} ALUZ A8-ZIZA-SOP에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ALUZ A8-ZIZA-SOP 12 페이지.
ZIZA
Standard Optic
A8-ZIZA-SOP
1
Measure area where luminaire will be installed. Use a laser line to create
a reference line along installation area, ensuring consistent alignment of
mounting clips. Mark location where each mounting clip will be installed
along reference line.
2
Mark location where mounting clips will be installed.
Note: The number of required mounting clips differs for dry and wet location
products. Verify number of mounting clips is appropriate for installation
environment before installing. Do not install luminaires with inadequate
number of mounting clips.
3
Lay mounting clips along reference line and pre-drill using an appropriate
drill bit for surface and screw size. Recommendation: 8/32 x 1" screw.
Note: Allow 0.25" clearance for lateral expansion of assembled mounting clips.
Only install mounting clips on flat, even surfaces.
4
Screw mounting clips to surface, then snap luminaires into mounting clips.
5
6
7
ALUZ
1170 North Red Gum Street, Anaheim, CA 92806
Phone: 800 921 2254 or 714 535 7900 | Fax: 714 535 7902 | [email protected] | aluz.lighting
© ALUZ All rights reserved. ALUZ reserves the right to make changes or withdraw specifi cations without prior notice.
If applicable, position jumper wires between luminaire segments as needed.
If applicable, connect disconnects between luminaires or solder connectors
using the steps from Application Guidelines.
Perform a continuity test before connecting luminaire to power source.
Installation Instructions
9 / 1 / 2021 / Rev 0
Page 9 of 12
Mounting Fixture (Wet Location)