ALUZ ZIBI A1 Series 설치 지침 매뉴얼 - 페이지 5
{카테고리_이름} ALUZ ZIBI A1 Series에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ALUZ ZIBI A1 Series 12 페이지. Surface zuco pivot bios illuminated
ALUZ ZIBI A1 Series에 대해서도 마찬가지입니다: 매뉴얼 (11 페이지), 매뉴얼 (13 페이지), 매뉴얼 (11 페이지), 설치 지침 매뉴얼 (11 페이지)
1
Measure area where luminaire will be installed. Use a laser line to create
a reference line along installation area, ensuring consistent alignment of
mounting clips. Mark location where each mounting clip will be installed
along reference line.
2
Use 1 mounting clip every 2', rounded up. Use a minimum of 2 mounting clips
per luminaire segment. For vertical applications, create a stopper at the
bottom of the run to prevent sliding.
3
Space mounting clips evenly throughout the run.
Example: 20' Run.
8'
3" Gap
Mounting Clip
4
Insert stakes into ground until entire tapered portion is submerged.
Note: The ground must be able to support the weight of the luminaires.
1170 N Red Gum St, Anaheim, CA 92806
aluz.lighting
© ALUZ All Rights Reserved. ALUZ reserves the right to make changes or withdraw specifi cations without prior notice.
A1 Series | Surface
ZIBI Standard RGBW
(A1-ZIBI-STN-RGBW)
20'
8'
4'
Junction between luminaire segments
866.ALUZ.LTG | 714.535.7900
5
Ensure each stake is secured in place, then snap luminaires into mounting clips.
6
If applicable, connect disconnects between luminaires. Slide shrink tube over
connectors and apply heat. The shrink tube will shrink down, sealing the
connectors. Apply silicone around sealed connectors for a stronger seal.
Page 5 of 12
Stake Mounting Clip
Shrink Tube
2"
Apply Heat
Installation Instructions
4 / 29 / 2022 / Rev 2