Alvarado Supervisor 500 설치 지침 매뉴얼 - 페이지 6
{카테고리_이름} Alvarado Supervisor 500에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Alvarado Supervisor 500 19 페이지. Barrier-free optical counting turnstile
Conduit Requirements
NOTE
The conduit openings for each cabinet are
8" x 2.80" (203mm x 71mm) [Figure 7].
Primary Power Conduit (High Voltage Power)
•
3/4" (19mm) power conduit for primary source
power (e.g. 120 VAC, 220 VAC) must be run to
the master and center cabinets.
Ethernet Conduit (GateWatch / Network)
•
3/4" (19mm) conduit for Ethernet. Networked
turnstiles must have Ethernet cable run to all
master and center cabinets.
Crossover Cable Conduit
1 1/2" (38mm) conduit must be run to
•
interconnect the cabinets in each lane.
NOTE
For multi-lane conduit requirements, refer to Appendix
A on Page 36.
Electrical Requirements
Power Supply
110-240 VAC, 50/60 Hz
Power Requirements
Peak power consumption is 22W per lane with all options installed.
Operational Voltage
Primary power is stepped down and rectified for low-voltage12 VDC and 5 VDC
operation.
Fuse
2.5A (slo-blo) located in the master cabinet
Surge Protection
Alvarado suggests the use of surge protection on the high-voltage power line to
further protect electronics
Page 10
For Assistance: [email protected] +1 (909) 591-8431
SU500 Installation Instructions
Figure 7
Conduit Openings
Slave
Master
Cabinet
Cabinet
Symbology
Description
Conduit Size
Primary
3/4"
Power
Ethernet
3/4"
Cable
Crossover
1.5"
Cable
NOTE
Seal the floor area around the conduits running up and
into the cabinets. This will prevent condensation and
debris build-up coming from whatever may be below
the floor.
PUD1456R5-0
SU500 Installation Instructions
Environmental Requirements
•
DO NOT install the product outdoors. This product is intended for indoor use only.
•
DO NOT install the SU500 where infrared lighting (strobe lights, flash photography, etc.) is in the direct path of the
optical sensors. Interference may affect the performance of the turnstile.
The following are suggested operating temperature and humidity ranges for the SU500:
Temperature Range
Humidity Range (Non-Condensing)
Operating the SU500 outside the suggested temperature and humidity ranges may negatively affect
CAUTION
turnstile performance and could potentially cause damage to turnstile components.
Pre-Installation Checklist
It is the installer's responsibility to ensure the following steps are completed before beginning the installation.
1.
All components and hardware to be installed have been unpacked, correctly identified, and moved to the installation location.
2.
The turnstile configuration and layout has been confirmed with the site manager.
3.
All applicable requirements in the Pre-Installation Requirements section have been met.
PUD1R5-0
For Assistance: [email protected] +1 (909) 591-8431
Operation
Non-Operation/Storage
10° - 32°C / 50° - 90°F
0° - 40°C / 32° - 104°F
15% - 85% RH
--
Page 11