Anchoring Instructions

1) The hydraulic arm is detached from the gate for
ease of shipping. Before removing the gate the from
the shipping crate, reattach the hydraulic arm hinge
to the gate using (2) 1/4" machine screws. [Figure 3].
2) Determine the installation location of the gate, taking
into consideration the minimum width opening
required; refer to Drawings & Dimensions section
on Pg. 7 for minimum installation requirements.
Once the installation location is confirmed, snap a
chalk line on the floor to mark the centerline of the
gate. The chalked centerline should be at least 6"
longer than the overall width of the gate.
3) Set the gate on the chalk line, facing in the correct
direction of operation.
CAUTION
Care must be exercised when moving the gate
The gate weighs approximately 400lbs. Until
the gate is securely fastened to the concrete
foundation, secure the gate / frame assembly
to prevent the unit from falling.
NOTE
The gate should swing in the exit direction.
Refer to Configurations Available on Pg. 5 if
there is any uncertainty of orientation.
4) Mark the center locations of the (4) four anchor holes
in each of the frame's base plates.
5) Move the gate to the side and drill a 5/8" diameter
hole to a depth of 3" at the center of each marked
location. For terrazo, ceramic tile, or brick veneer
installations, add the thickness of the finished floor
material to anchor the hole depth.
6) Vacuum out the holes thoroughly. If the holes are not
clean, the anchors will not tighten.
7) Insert one anchor into each drilled hole. Ensure
the anchors are flush with the concrete floor or
finished surface and the threads are down as shown
in [Figure 4].
NOTE
It is recommended to brace the top of the gate with supplemental products or with exisiting structure to increase
rigidity and support.
Page 8
For Assistance: [email protected] +1 (909) 591-8431
MSG Installation and Maintenance Instructions
Drill hole.
Insert the anchors
Clean hole.
with the thread side
Vacuum debris.
down. The anchors
must be a with the
surface.
Figure 3
Figure 4
Insert the washer.
Insert the bolt.
Tighten bolt.