Maintenance

General maintenance best practices:
Inspect all gates one or two weeks after they are installed to ensure they are operating properly. Inspect the gates again about
sixty days after they are installed.
The frequency of regular maintenance is determined by gate usage and environment. However, Alvarado recommends regular
maintenance be performed at least once per year. Perform maintenance more frequently if the gates are used frequently or are
installed in humid or dusty environments.

Maintenance Points

Check the maintenance points identified in the image below to ensure proper gate operation.
Lower Pivot Spring
Floor Is Level

Anchor Tension

Remove the base covers and check gate levelness and anchor tension when performing maintenance. Ensure the anchors are
tightened to 20 ft.-lbs. Clean any accumulated dirt or dust.

Wiring Inspection

For VSGX units, inspect all wires and contacts for signs of wear, abrasion, or exposed metal parts that could lead to a short.
Replace as needed.

Pivot Points

Check the top bracket hinge and lower pivot spring hinge point for debris and remove if found.

Lock Alignment

For VSGX units, verify the electric lock mechanism is aligned properly. When properly aligned, the gate arm should lock
automatically when it returns to its home position while the gate is powered.
Page 12
Top Bracket Hinge
Hinge Post Anchoring