DM Bath DMV2401 설치 매뉴얼 - 페이지 3
{카테고리_이름} DM Bath DMV2401에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DM Bath DMV2401 8 페이지.
Vanity Cabinet Installation
01.
Determine the vanity placement and mark the area
on the wall where it will be installed. Check that the
wall is straight, not bowed or twisted. Ensure vanity
is square against the wall before securing. Door
and drawer alignment could be affected otherwise.
03.
DM Bath freestanding vanities have a solid back.
Mark and drill holes to accommodate drain and
supply pipes as necessary.
05.
Attach the vanity to the wall by screwing through
the back of the vanity cabinet into the wall studs.
07.
Adjust doors/drawers if required as they may have
moved during installation, refer to DRAWER &
DOOR ADJUSTMENT on page 3.
SIDE VIEW
02.
Mark the location of the wall studs to which vanity
will be fastened. If the studs do not line up to the
mounting location for your vanity, wood bracing can
be installed between the studs using standard 2 x 4's
behind the finished wall. This should be performed by
a qualified licensed trade professional.
MARK
SCREWS
04.
Place the vanity in desired installation location. Verify
that the vanity cabinet is level. If the vanity is not
level, use feet levelers to adjust as necessary.
60" single
06.
Follow instructions for Sink & Countertop Installation
if using a DM BATH Sink & Countertop. If using a
custom top and sink, follow Manufacturers installation.
For DM BATH VESSEL SINK & COUNTERTOP
INSTALLATION, proceed to page 4.
For DM BATH UNDERMOUNT SINK & COUNTER-
TOP INSTALLATION, first proceed to page 4 for
COUNTERTOP INSTALLATION PRECAUTION then
proceed to page 5.
08.
Choose the positioning of hardware of your choice
(not included) on the vanity cabinet. Mark the screw
hole location. Drill the cabinet with appropriate size
60" single
bit to accommodate the screw diameter. Install your
chosen hardware. Do not overtighten.
WALL STUDS
60" single
2