AIO 2510-SXT 설치 및 시작 매뉴얼 - 페이지 4

{카테고리_이름} AIO 2510-SXT에 대한 설치 및 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. AIO 2510-SXT 7 페이지. Iron air charge

Pre-Installation

1. If you are going to be turning off the water to the house and you have an electric water heater, shut
off the power to the water heater before beginning installation in case water heater is accidentially
drained.
2. Pick a suitable location for your filter system on a dry level spot where it won't be exposed to freezing
temperatures. A minimum of 20 PSI is required. Maximum pressure is 90 PSI.
3. Get all of your plumbing parts together before beginning installation. Installation typically takes 3 to 5
hours. However after installation the 2510 SXT Air Charger Filter must be allowed to run through a
complete backwash and rinse cycle.
4. After the system is installed and running, your water may be discolored, or full of sediment or rust,
particularly if this is older or corroded piping. Typically this clears up over a day or two.

Assembly and Installation Instructions

1. The 2510 SXT Air Charger filter is installed after the pressure tank. If you are also installing a water
softener, install the softener after the 2510 SXT Air Charger filter.
2. Make sure to follow to connect the in pipe to the Fleck 2510 SXT inlet and the outlet to the outlet (see
Fig 2). As you face the Fleck 2510 SXT control from the front, the water enters on the right and exits on
the left. From the back (see Fig 2) the water enters on the left. The inlet and outlet are attached to
the bypass valve which is marked with arrows as well.
3. Make sure there is a working gate or ball valve before the Fleck 2510 SXT Air Charger filter and also
one after. Pressure gauges are optional and perhaps not necessary but a hose bib (which is a faucet
that you can attach a garden hose to) is strongly recommended after the 2510 SXT Air Charger filter
before the second ball valve. This makes it easy to rinse your new 2510 SXT Air Charger filter on start-
up and gives you a place to test the water before it enters your household plumbing.
4. If you will be using copper piping, do not sweat the copper pipe directly on to the Fleck 2510 SXT
control valve. Avoid heating up the Fleck 2510 SXT control valve plastic with the torch.
5. You do not need unions to install your Fleck 2510 SXT control. If you need to remove it, the Fleck 2510
SXT has quick-release couplings that make it easy to put the 2510 SXT Air Charger filter on by-pass and
remove the filter system from the piping.
6. The drain line tubing (not supplied) is connected to a drain from the drain outlet using flexible ½" ID
tubing. Note that the drain can run up above the Fleck 2510 SXT control and into a drain, it does not
have to drain down, as the filter backwashes under line pressure from your well pump.
REV 070914
Iron Air Charge 2510-SXT Installation & Startup Guide
Page 3