Fleck 9000 설치 매뉴얼 - 페이지 19

{카테고리_이름} Fleck 9000에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Fleck 9000 19 페이지. Twin tank water softener

Fleck 9000 설치 매뉴얼
9 › I n I t I a l s ta r t- u P
1) With one nearby softened faucet running in the COLD position, slowly open your bypass valve or 3-valve bypass
to about ¼ open to allow the air trapped in the softener to escape via your running faucet.
bypass too quickly or too open may damage your softener or plumbing
2) Allow the softener tank to slowly fill with water. After a few minutes, you will see a trickle of water coming from
the cold water faucet. Allow the water to run slowly in this manner for an additional 5 minutes. Next, with the
cold water faucet still running, gradually move your bypass valve to the fully open position.
some initial discoloration from the softened water – this is normal and should dissipate within the first
40-50 gallons of water used.
3) Repeat steps 1 and 2 for the other tank (it will switch to the other tank automatically after a regeneration)
To test the integrity of your new system and all connections
4) i
perform a short form regeneration to check for leaks before service.
mately 5 gallons of water/the amount of water needed to cover the brine grid into the brine tank
If you have the mechanical version of the Fleck 9000,
5)
clockwise, let the regeneration run its full course to completion, and check the entire system for leaks. If you
notice a leak originating from the drain line/connection,
nection. If you notice a leak originating from the brine line/connections,
preparing the brine tank connection
If you have the electronic Fleck 9000 SXT version,
6)
REGEN button for 5 seconds. Once the screen stops flashing BW, let BW - Backwash run for about 1 minute
to observe the water leave out the drain line and check for leaks. If you notice any leaks,
review preparing the drain connection. Click the REGEN button ONCE to move on to BD - Brine Draw
7) Once the screen stops flashing BD, let BD - Brine Draw run for about 1 minute to observe the water level in
the brine tank being drawn lower. Also check the brine line and the float valve in the brine well for leaks. If the
water level doesn't lower or there is a leak,
connection. Click the REGEN button ONCE to move on to RR - Rapid Rinse
8) Once the screen stops flashing RR, advance from RR - Rapid Rinse to BF - Brine Fill by clicking the REGEN
button ONCE more. Once the screen stops flashing BF, let BF - Brine Fill run for about 1 minute to observe the
water level in the brine tank rise. Also check the brine line and float valve in the brine well for leaks. If the water
level doesn't rise or there is a leak,
Click the REGEN button ONCE to finish
9) Now you may add 120-160 pounds of pellet, solar, or block salt to your brine tank.
filled with salt to at least above the water level.
after installation as the new resin arrives at full softening capacity. Simply let your softener meter automatically
trigger regenerations by tracking the water consumption
› c o n G r at u l at I o n s
Your new softener with Fleck 9000 Meter Valve is now properly installed and programmed! Please
maintain your system by keeping the softener plugged-in and always keep your brine tank filled
with salt to at least above the water level. We appreciate your business and hope that you enjoy
years of trouble-free softened water!
Help: 888-426-5001
Turn off the running cold water faucet when the water runs clear
return to page 14
begin the regeneration sequence by HOLDING the
return to pages 12 and 13
return to pages 12 and 13
You do not need to perform a full regeneration immediately
QualityWaterForLess.com
it is strongly encouraged that you
,
Begin this process by adding approxi-
begin a regeneration by turning the timer wheel
to review preparing the drain con-
return to pages 12 and 13
to review preparing the brine tank
to review preparing the brine tank connection.
Always keep your brine tank
NoTe: opening the
NoTe: You may see
to review
return to page 14
to
PAGE 19