Dodge 5500 Ram Chassis Cab vehicle 운영 및 설치 매뉴얼 - 페이지 15

{카테고리_이름} Dodge 5500 Ram Chassis Cab vehicle에 대한 운영 및 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dodge 5500 Ram Chassis Cab vehicle 17 페이지. Chassis cab vehicle
Dodge 5500 Ram Chassis Cab vehicle에 대해서도 마찬가지입니다: 사양 차트 (2 페이지), 사양 (4 페이지)

Dodge 5500 Ram Chassis Cab vehicle 운영 및 설치 매뉴얼
PTO Operation & Installation Guide
PTO Operation & Installation Guide
PTO Operation & Installation Guide
PTO Operation & Installation Guide
Description of Pressure Ports for the Aisin Transmission. PTO
Pressure Line to be connected only to #9 Line Main Pressure.
Location of the Pressure Plugs
Right Side Veiw (Passenger side)
Right Side View (Passenger Side)
Torque Converter Out (to Cooler)
B1 (Brake No1) Pressure
B2 (Brake No2) Pressure
L/U (Lock Up Clutch) Pressure
L/U (Lock Up Clutch) Pressure
Left Side View (Driver Side)
Left Side Veiw (Driver side)
Lubrication
Line (Main) Pressure
Torque Converter In (from Cooler)
2011 Chassis Cab
2011 Chassis Cab
2011 Chassis Cab
2011 Chassis Cab
⑦  ⑥ ⑤  ④
M10x1.25
1/2-20UNF-2B
C1 (Clutch No1) Pressure
C2 (Clutch No2) Pressure
C3 (Clutch No3) Pressure
Hole Detail (All)
2.5
15
01/22/2010
φ14.1
12°
45°
+ + + +
+ + + +
ALL
ALL
IN
IN
- - - -
- - - -
OUT
OUT