Dodge 5500 Ram Chassis Cab vehicle 운영 및 설치 매뉴얼 - 페이지 15
{카테고리_이름} Dodge 5500 Ram Chassis Cab vehicle에 대한 운영 및 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dodge 5500 Ram Chassis Cab vehicle 17 페이지. Chassis cab vehicle
Dodge 5500 Ram Chassis Cab vehicle에 대해서도 마찬가지입니다: 사양 차트 (2 페이지), 사양 (4 페이지)
PTO Operation & Installation Guide
PTO Operation & Installation Guide
PTO Operation & Installation Guide
PTO Operation & Installation Guide
Description of Pressure Ports for the Aisin Transmission. PTO
Pressure Line to be connected only to #9 Line Main Pressure.
Location of the Pressure Plugs
Right Side Veiw (Passenger side)
Right Side View (Passenger Side)
③
①
Torque Converter Out (to Cooler)
②
B1 (Brake No1) Pressure
③
B2 (Brake No2) Pressure
④
④
L/U (Lock Up Clutch) Pressure
L/U (Lock Up Clutch) Pressure
Left Side View (Driver Side)
Left Side Veiw (Driver side)
⑧
Lubrication
⑨
Line (Main) Pressure
⑩
Torque Converter In (from Cooler)
2011 Chassis Cab
2011 Chassis Cab
2011 Chassis Cab
2011 Chassis Cab
②
①
⑦ ⑥ ⑤ ④
⑧
⑨
⑩
M10x1.25
1/2-20UNF-2B
⑤
C1 (Clutch No1) Pressure
⑥
C2 (Clutch No2) Pressure
⑦
C3 (Clutch No3) Pressure
Hole Detail (All)
2.5
15
01/22/2010
φ14.1
12°
45°
+ + + +
+ + + +
ALL
ALL
IN
IN
- - - -
- - - -
OUT
OUT