clivus multrum CM40 설치 매뉴얼 - 페이지 11

{카테고리_이름} clivus multrum CM40에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. clivus multrum CM40 19 페이지. Waterless composting toilet systems
clivus multrum CM40에 대해서도 마찬가지입니다: 설치 매뉴얼 (18 페이지), 설치 매뉴얼 (18 페이지), 사용 설명서 (20 페이지)

TOILET CHUTE & PEDESTAL
1
Please refer to the Pedestal
installation manual for instructions
on how to locate the pedestal in
your bathroom.
2
3
IMCM-40.090522
FRONT
BACK
< 5mm of sideways play around the hole.
Note: If the floor of the building is high above
the top of the tank a chute extension piece/s
may be needed. Extra lengths are available from
your supplier. Joints should be screwed with
short self-tapper screws, and sealed with silicon.
If more than 2 chutes are joined then additional
support straps or brackets are needed to support
their weight from the building frame, instead of
hanging only by the top chute.
www.ecoflo.com.au
1300-138-182
A3 Template to
cut chute hole at
the correct size
(included with
pedestal).
Using the outside of the toilet
chute as a template, mark and
cut the chute hole into the top
of the tank.
11