clivus multrum CM8 설치 매뉴얼 - 페이지 11
{카테고리_이름} clivus multrum CM8에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. clivus multrum CM8 19 페이지. Waterless composting toilet systems
clivus multrum CM8에 대해서도 마찬가지입니다: 설치 매뉴얼 (18 페이지), 설치 매뉴얼 (18 페이지), 설치 매뉴얼 (16 페이지), 설치 매뉴얼 (19 페이지)
INSTALLATION FOR BURIED ANCHOR
SYSTEM ONLY
LEFT SIDE VIEW
Unequal FRP Angle
Eye Nut
2nd Rope Clamp
Steel Wire
1st Rope Clamp
Concrete Sleeper
IMCM-8.130522
A
A
A = SECTIONAL VIEW LEFT SIDE
THIS IS TO BE DONE ON BOTH SIDES OF THE TANK
For a buried system it is required to
tie the tank down with the optional
pack. This is to attach both sides of
the CM8 tank to the sleeper.
Replace M6 nut on front and back
edge with provided eye nut.
Feed steel wire around the concrete
sleeper and through the 1st rope
clamp and tighten to sleeper.
Feed remaining wire through eye
nut and tighten with 2nd rope
clamp.
Repeat on opposite side of CM8.
www.ecoflo.com.au
1300-138-182
Installation of
Anchor system to
CM8
11