Doherty PLE01 사용자 지침 - 페이지 17
{카테고리_이름} Doherty PLE01에 대한 사용자 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Doherty PLE01 20 페이지. 2 & 3 section plinths
Prior to any general maintenance always disconnect the plinth from the mains supply.
Sidhil recommends that every six months the following maintenance procedures
should be carried out to help prolong the life of the plinth:
•
Ensure that all fixings including nuts and bolts are tight and that none are missing
or incomplete.
•
Check that all cabling is in good condition and that wear or abrasion has not
caused any excessive bending, kinking or damage.
•
Check that the mains cable plug is not damaged. Should damage or deterioration
occur to the mains cable or plug, they must be replaced by authorised Doherty
service or repair personnel or approved service agents only.
WARNING!
15
9. MAINTENANCE