Cypress S6SBP202A1FVA1001 운영 매뉴얼 - 페이지 9

{카테고리_이름} Cypress S6SBP202A1FVA1001에 대한 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cypress S6SBP202A1FVA1001 15 페이지. Automotive pmic evaluation kit

Setup

4.

Connecting

4.1
1. Connect the board to the power supply, load equipment and voltage meter as below.
+12V Power
Supply

Verification

4.2
1. Connect ENA pin to PGND1f, then, turn on +12V power supply.
2. Connect ENA pin to VBATf, then, DC/DC converter will start output.
3. Check that VOUTf is the same as the 'Output Voltage' of Figure 2-1 Evaluation Board Specification.
S6SBP20xAxxVA1001 Operation Manual, Doc. No. 002-08763 Rev. *B
Figure 2 Connecting the Board and Some Equipment
-
+
Details
-
Voltage
Meter
+
-
Load
+
9