Cypress Envirosystems WPT 빠른 시작 매뉴얼 - 페이지 3

{카테고리_이름} Cypress Envirosystems WPT에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cypress Envirosystems WPT 8 페이지. Gateway and server

2 WPT Gateway and Server Installation
The overall WPT installation procedure includes:
Mounting the Gateway and Server. The Gateway communicates to the Server
using a CAT5 or CAT6 Ethernet cable.
Powering up the Gateway and Server.
Setting up the Server and Gateway with the list of installed WPTs
2.1
Mounting and Initial power-up
The WPT LoRa Gateway and Server can be wall-mounted using the included wall-
mounting tabs. Once mounted to the wall, the two devices must be connected with
ethernet, power and the antenna. Please refer to Figure 2 for the connection diagram.
After the ethernet, power and antenna are connected, power up the server using the
rocker switch under the power connector.
To access the server during installation, there are 2 options.
1. Connect a monitor, keyboard and mouse directly to the server.
2. Use the installation ethernet port to connect a Windows laptop. This port is set at
the factory for a static IP address 192.168.2.100 with subnet mask 255.255.255.0.
Once connected, you can use a Remote Desktop session to interact with the
server.
Building network /
Installation port
Power
Figure 2: Connection Diagram
Contact [email protected] for IP info
WPT Gateway and Server
Quick Start Guide
Document No. 910-00029-01, Rev 02
Power
Ethernet
cable
900 MHz
Antenna
Page 3 of 8