Asian Phoenix Resources PowerPal MHG-500LH 사용 및 관리 지침 매뉴얼 - 페이지 8

{카테고리_이름} Asian Phoenix Resources PowerPal MHG-500LH에 대한 사용 및 관리 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Asian Phoenix Resources PowerPal MHG-500LH 13 페이지. Low head micro-hydroelectric generator

2. Place the canal - pipe assembly in the stream and support the pipe end so that the
pipe is not touching the stream bed. The lower end of the pipe must be at least 20
cm above the stream bed as well as at least 20 cm below the water surface (see the
System Diagram). The water level in the canal should be at least 20cm and the
recommended flow rate should be available. The base of the canal must be level,
or horizontal. When installed correctly, a vortex should be observed over the hole
that enters the pipe.
3. If provided, insert the debris screen into the upstream end of the canal, but not the
flow gate.
4. Place the turbine end of PowerPal into the hole in the canal (shown below). This
should be a good fit so that PowerPal is vertical and does not move from side to
side. You will notice from the sound and gentle vibrations that PowerPal begins
working immediately. If you do not notice this then there is a problem with your
site. Check again that you have followed the initial procedures correctly. The
lower bearing is lubricated by water so water must be allowed to enter the lower
hole drilled in the shaft tube.
5. If the rate of water flow entering the canal is too high you will need to insert the
flow gate to the required position to reduce this rate. One way to determine if the
flow rate is too high is if the water level in the canal is too high. The water level
should not be so high that it overflows the canal sides. Another indicator is the
presence of 'standing waves', or stationary waves on the water surface in the
canal. The water surface should be reasonably smooth, without stationary waves.
If, after inserting the flow gate there is a high level of water turbulence you will
have to reduce this. The easiest way is to modify the stream flow upstream of the
canal. Use boulders or sticks to achieve the desired flow.
6. Plug in the electronic load controller (ELC) into the socket on PowerPal.
About the electronic load controller
The water turbine captures the water's energy and converts it into electricity. The
generator's output voltage is dependent on the load consumption. When there is no power
being consumed, the output voltage can reach 280V – 300V. This output voltage will
decrease with any increase in power consumption. The electronic load controller is used to
eliminate this excess output voltage (>220V) so that it is safe to use household appliances.
Keep fingers away from the moving propeller.
Do not allow electrical
contacts to become wet.
Use dry hands. Beware
of electrocution.
PowerPal™ Low Head 8