Asko H5 사용 및 관리 매뉴얼 - 페이지 10
{카테고리_이름} Asko H5에 대한 사용 및 관리 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Asko H5 12 페이지. Asko h5 hob: user guide
building-in dimensions
14
526
min.
50
490
750
560
46
* Only necessary when an oven is fitted under the hob
building-in
50
1
Make the cut-out in the work surface.
Ensure that there is sufficient space
allowed at the sides and at the back
(see "building-in dimensions").
2*
Make a hole in the side of the kitchen
cabinet to enable the gas pipe to be
passed through (see "building-in
dimensions").
3*
Place the hob in the cut-out. Check that
the air inlets at the back of the hob are
clear.
4
Secure the hob in position. The
brackets clamp either at the sides or
underneath the work surface. Tighten
the bracket bolts sufficiently to ensure
the under seal is seating evenly on the
work surface.
5
Make the gas connection. Check the gas
connections with a soap/water mix
(see "Gas Connection").
6
Put the plug in the socket
(see "Electrical Connection").
7
Test to check the hob is operational.
15