American Standard 8630 Series Installation Instructions - Page 2

Browse online or download pdf Installation Instructions for Indoor Furnishing American Standard 8630 Series. American Standard 8630 Series 2 pages. 8630 series three handle bath/shower sets

American Standard 8630 Series Installation Instructions
1
Turn off hot and cold water supplies before beginning.
ROUGHING-IN FITTING
Prepare water supplies per "Roughing-in Dimensions."
Slip COUPLING NUT over supply pipe and screw UNION SWIVEL
to pipe.
For Sweat Connection: Slip COUPLING NUT over 5/8" O.D.
supply tube and solder tube into UNION SWIVEL or female inlet
of valve.
Install VALVE at indicated height and depth. Notice that finished wall has
to be between the MAX WALL and MIN. which is 1-5/8" below.
Connect HOT water supply to left VALVE inlet and COLD water
supply to right VALVE inlet. Tighten both COUPLING NUTS firmly.
Secure VALVE BODY to cross brace of wall structure.
2
ROUGHING-IN SHOWER AND SPOUT
Prepare SHOWER RISER, ELBOW, and roughing-in NIPPLE and
connect to top outlet of VALVE BODY. Outlet is 1/2" female NPT.
Prepare TUB FILLER PIPE, ELBOW and 1/2" NPT SPOUT NIPPLE.
Final length of SPOUT NIPPLE to be 1-1/2" from finished wall.
Add cross braces to wall structure and secure piping.
Cap roughing-in nipples, open supply lines and check for leaks.
Remove PLASTER GUARDS by turning counter clockwise and pulling. (Do not discard).
PLASTER GUARD has a STEM SOCKET to operate valves.
Turn PLASTER GUARD over and push STEM SOCKET onto VALVE STEM.
Open hot and cold valves and check for leaks.
Close both valves, turn off water supplies, and replace PLASTER GUARDS.
Finish wall construction.
3
FINISHING INSTALLATION
Remove caps from roughing-in nipples.
Remove PLASTER GUARD by turning counter-clockwise and pulling.
If VALVE BODY is roughed in deep (more than 1-1/2") screw
SLEEVE in ESCUTCHEON facing front of ESCUTCHEON.
If VALVE BODY is roughed in SHALLOW (less than 1-1/2")
screw SLEEVE in ESCUTCHEON facing back of ESCUTCHEON.
Assemble RUBBER RING to ESCUTCHEON.
Screw ESCUTCHEON and SLEEVE onto VALVE COVER against wall.
Install SHOWER ARM, SHOWER ARM FLANGE and TUB SPOUT.
4
TEST INSTALLED FAUCET
Turn HANDLES into "off" position.
Turn on water supplies and check all connections for leaks.
5
SERVICE
To change direction of handle rotation,
proceed as follows:
Turn valve to OFF position.
Pull out INDEX CAP and remove
HANDLE SCREW.
Pull off HANDLE BASE and remove
ADAPTER.
Remove SPRING CLIP .
Lift STOP WASHER, turn 90 and replace.
Replace SPRING CLIP .
Reinstall HANDLE. (See step 4).
CAUTION
STOP
WASHER
SHOWER
ARM
"MAX
WALL"
STEM
SOCKET
PLASTER
GUARD
D E E P R O U G H - I N
M O R E T H A N
1 - 1 / 2 "
S L E E V E
VA LV E
C O V E R
R U B B E R
R I N G
Operate both HANDLES to flush water lines thoroughly.
Check SHOWER HEAD and connections for leaks.
Turn handles into OFF position.
If spout drips, operate handles several times from OFF to ON
90
position. Do not force - handles turn only 90 .
SPRING
CLIP
P r o d u c t n a m e s l i s t e d h e r e i n a r e t r a d e m a r k s o f A m e r i c a n S t a n d a r d I n c .
© A m e r i c a n S t a n d a r d I n c . 2 0 0 0
ROUGH-IN
NIPPLE
SHOWER
HEAD
"HOT"
TUB
FILLER
PIPE
SPOUT
ELBOW
ROUGH-IN
NIPPLE
S H A L L O W R O U G H - I N
S L E E V E
VA LV E
B O D Y
E S C U T C H E O N
HOTLINE FOR HELP
For toll-free information and answers to your questions, call:
1 (800) 442-1902
Weekdays 8:00 a.m. to 7:00 p.m. Eastern Time
IN MEXICO 01-800-839-12-00
IN CANADA 1-800-387-0369 (TORONTO 1-905-306-1093)
ELBOW
CROSS
BRACE
"COLD"
UNION
SWIVEL
SUPPLY
PIPE
COUPLING
NUT
L E S S T H A N
1 - 1 / 2 "
M 9 6 8 7 1 6 R e v. 1 . 1