DOMUSA TEKNIK Silo Installation And Operating Instructions Manual - Page 4
Browse online or download pdf Installation And Operating Instructions Manual for Stove DOMUSA TEKNIK Silo. DOMUSA TEKNIK Silo 20 pages.
Silo
1 WARNINGS AND SAFETY INSTRUCTIONS
Read this instruction manual carefully and keep it in a safe, easily-accessible place. DOMUSA TEKNIK
will not be liable for any damages caused by failure to follow these instructions.
To guarantee optimum functioning of this kit and a long lifetime, the installation and maintenance
must be carried out by qualified personnel authorised by DOMUSA TEKNIK. The installer is responsible
for the functioning of any devices or controls not supplied with the Silo.
This appliance must only be used for the purpose for which it has been expressly designed. Any other
use is considered unsuitable and therefore hazardous. The manufacturer shall not be considered liable
under any circumstances for damage caused by unsuitable, erroneous or irrational use.
The Silo is specifically designed to store 6 mm diameter wood pellets, installed together with a
DOMUSA TEKNIK CVS suction system pneumatic conveyance system.
During installation or before any servicing, the following indications must be complied with to
prevent personal injury or material damage:
Remove all the packaging and check the contents are all there. In the event of any doubt, do not
use the produt. Contact your supplier. Keep the packaging elements out of reach of children, as
they can be dangerous. Keep children away while you are working in the pellet store.
The Silo withstands UV rays but it should not be exposed directly to rain, and so it should not be
installed outdoors, unless it is in a sheltered place. Neither should it be placed in direct contact
with a damp wall, particularly the canvas.
The applicable fire protection regulations must be observed.
Ensure there are no sharp objects close to the Silo which could damage the Silo. Any damage
caused by insects, rodents and sharp objects or similar is not covered by the guarantee.
To prevent electrostatic charge accumulating during the Silo filling process, the filling nozzle
must be earthed. The filling hose must be totally covered by the opening in the
Silo. We recommend switching off the boiler before filling the Silo.
Fix the vertical bar bases to the ground with metal bolts and fixing blocks. Do not forget to check
that all the bolts have been correctly tightened, that the Silo is level and that the clamps have
been fitted to the suction unit and a clamp to the filling nozzle.
2