American Standard Baby Devoro 2282 Installation Instructions Manual - Page 7

Browse online or download pdf Installation Instructions Manual for Toilets American Standard Baby Devoro 2282. American Standard Baby Devoro 2282 13 pages. Baby devoro flushometer bowl
Also for American Standard Baby Devoro 2282: Installation Instructions Manual (14 pages)

American Standard Baby Devoro 2282 Installation Instructions Manual
INSTALL THE SWEAT SOLDER
1
ADAPTER; Fig. 3
Turn water supplies off
CAUTION
before beginning
Note: Install Optional Sweat Solder Adapter
(Supplied) for copper pipe supply line. Fig. 3.
1. Measure the distance (A) from the finished wall to the
center of the inlet spud on the fixture.
2. Cut the supply pipe 1-1/4" (A-B=C) shorter then the
measurement taken in Step 1. File any rough edges off
the end of the supply pipe.
3. Clean the end of the supply pipe. Push the threaded
Adapter on until it is seated against the internal stop.
Sweat the Adapter to the pipe.
INSTALL COVER TUBE, WALL
2
ESCUTCHEON and SUPPLY STOP;
Fig. 4
1. Measure from finished wall to first thread of Adapter
or threaded supply pipe (dimension "X"). Cut COVER
TUBE (1) to length (X). Apply Teflon Tape to the
threaded end of the Adapter or supply pipe. Fig. 4a.
2. Push the COVER TUBE (1) into the WALL
ESCUTCHEON (2). Slide both onto the SUPPLY PIPE
(3). Fig. 4b.
3. Push the COVER TUBE (1) in to expose the threads
of the supply pipe. Fig. 4c. With a wrench thread the
SUPPLY STOP (4) onto the SUPPLY PIPE (3). Align
and tighten. Fig. 4c.
4. Pull COVER TUBE (1) against SUPPLY STOP (4)
and push WALL ESCUTCHEON (2) against finished
wall.
INSTALL DOWN TUBE AND
3
VACUUM BREAKER; Fig. 5
1. Place the SPUD FLANGE (1) over the spud on the
Fixture.
2. Thread SPUD COUPLING NUT (2) onto Spud.
Make sure SEAL WASHER (3) and FRICTION
WASHER (4) are installed. Do not tighten fully.
3. Insert the DOWN TUBE (5) into the SPUD
COUPLING NUT (2) and push it down.
Note: If cutting Down Tube (5) to size, note that
Critical Line (C/L) on Vacuum Breaker must
typically be 6" (152mm) above fixture. Consult
Code for details.
Fig.3
FINISHED WALL
A
(A-B)=
C
FILE EDGES
CLEAN
ADAPTER
SOLDER
ADAPTER
Fig. 4
Fig. 4a
Fig. 4b
3
Fig. 4c
1
Fig. 5
5
2
1
3
CENTER LINE OF
FIXTURE SPUD
B
32mm
(1-1/4)
FINISHED WALL
X
TEFLON TAPE
2
1
2
X
4
3
4
1-1/2" TOP SPUD
M968699 Rev. 1.6