Astra G-31,5 MS Manual Of Installation And Exploitation - Page 10
Browse online or download pdf Manual Of Installation And Exploitation for Boiler Astra G-31,5 MS. Astra G-31,5 MS 19 pages.
1. The manufacturer gives 2 year guarantee*, if the installation, start-up and regulation (the first
kindling and adjustment) and maintenance are performed by the certified company and the 6 months guarantee
if the mentioned works are executed by the non certified company :
- the guarantee repairs are performed, if the faults occur due to the manufacturer's fault or used
bad quality materials;
- guarantee period is not extended after boiler faults have been eliminated during the guarantee
period;
- boiler cleaning as well as boiler and heating system regulation are not included into the list of
guarantee repair works;
- guarantee doesn't mean that losses suffered due to the boiler fault occurred during the guarantee
period will be compensated;
- guarantee repair works and replacements of the parts are free of charge during the guarantee
period;
- the client pays for boiler installation and the first kindling and regulation works.
* One year guarantee is given to the boiler ventilator, thermo regulators and door stuffing (tightening
ropes).
2. Guarantee validation conditions:
- guarantee is valid from the boiler selling date;
- guarantee is valid, if the boiler is installed, connected to the heating system and exploited under
the requirements of this passport.
3. Guarantee is not applied in the following cases:
- when heat exchanger is limed;
- in case the heat transmitter is frozen;
- when the boiler is broken due to improper exploitation;
- when the boiler is broken due to improper connection of the electric input;
- when the boiler parts are mechanically damaged;
- if the boiler is connected to the heating system not under the schemes and requirements of this
passport.
4. The owner of the boiler pays himself for repair works performed after the guarantee period.
The heating boiler "Astra G
requirements and is accepted suitable for exploitation.
9. GUARANTEE AND ITS VALIDATION CONDITIONS
10. ACCEPTANCE CERTIFICATE
" serial No. _________ meets the standard (EN 303-5)
Manufacturing date _________________
Head of Quality
Service
____________________