Astra H-25 ES Manual Of Installation And Exploitation - Page 3

Browse online or download pdf Manual Of Installation And Exploitation for Boiler Astra H-25 ES. Astra H-25 ES 20 pages. Heating boilers

Power of the boiler (temperature of a heat carrier) is controlled automatically by a thermo-
regulator, by turning on or off a ventilator (ventilators) of the air inlet into combustion chambers;
and by a traction regulator, by closing or opening air supply opening cap of the ventilator.
Long load combustion period.
Control of the volume of air supplied to the upper and lower chambers of combustion
Complete fuel combustion ensures cost-efficient fuel exploitation.
Ashes might be removed only 1-2 times per week.
3. TRANSPORTATION, STORAGE, UNPACKING, PREPARATION TO EXPLOITATION
Heating boiler should be carefully loaded, unloaded and transported, suffering no big impacts. The
boiler can be transported only in a vertical position, fastened in order to avoid sliding and falling. If the boiler is
transported in other than vertical position, decorative surfaces may be damaged, tins battered, control and
regulation equipment broken, built-in ceramic kindling details may fall down and splinter.
The boiler should be stored also in a vertical position. It is not allowed to put one boiler on another,
as a safety-packaging frame is not designed for this purpose. The boiler should be stored in closed space
protected from atmospheric precipitations. Air humidity of the room should not exceed 80% in order to avoid
condensate (dew) forming on the surfaces of the boiler. Storage temperature may vary from -40 ºC to +60 ºC.
If the boiler was transported or stored in minus temperatures, then before it is kindled, it should be
kept in plus temperature no less than for 2 hours (for the order and requirements of the first kindling see section
6 of this passport).
After the heating boiler is delivered to the site, take off the packing frame and polyethylene film and
unscrew bolts of boiler fastening to the packaging base. Take off the boiler from the packaging base.
WARNING! Opening the doors of the boiler, check, if all tools listed in the section "THE BOILER
KIT" are there. Check, if painted surfaces haven't been damaged, components – not battered, control and
regulation equipment – not broken during transportation.
If notice any inadequacies of the listed above, lay your claims to the transportation or vendor company.
The kit consists of:
1. Boiler
2. Poker
3. Scraper
4. Guidebook for exploitation
6. Leg
These boilers of solid fuel are boilers of complete loading. For this reason they reach the highest
effectiveness when they are working at the nominal power and due to this the boilers must be equipped with
the accumulation tank of sufficient size which could accumulate the excessive heat volume.
Recommended capacity of the accumulation tank is about 50 liters for 1 kW of nominal power of
boiler:
Model of boiler
Required volume of
accumulation tank , liters
The boiler has to be exploited only with the installed emergency cooling system.
Description of the connection scheme of the emergency cooling serpentine (see Fig. No.4).
Thermostatic safety valve protects the boiler form the overheating. If the water temperature in the boiler
0
exceeds 95
C the valve automatically opens the flow of water from the water supply system through the cooling
serpentine. This water absorbs the excessive heat energy and flows out. Sensor of valve with the external
thread ½" is screwed in the socket on the rear wall of the boiler.
Technical data of the thermostatic safety valve :
Opening temperature
Highest working temperature
Working pressure
Pipe of sensor L=142 mm, external thread ½"
ATTENTION ! The system of the emergency cooling of the boiler can not be used for the heating
of water.
1 unit
1 unit
1 unit
1 unit
4 units

5. INSTALLATION

ASTRA H-25 ES
ASTRA H-31,5 ES
900
97±2
110
10 bar
ASTRA H-45 ES
1500
0
C
0
C
1800
3 |
P a g e