Akva SUBSEA FEEDER User Manual - Page 16
Browse online or download pdf User Manual for Fishing Equipment Akva SUBSEA FEEDER. Akva SUBSEA FEEDER 20 pages.
Daily:
Check mooring ropes.
Check buoyancy.
Weekly:
Check biofouling and remove if necessary (high water temperature, summer season).
Check icing and remove if necessary (low water temperature, winter season).
Remove grease deposits from inside the cyclone *
Monthly:
Visual inspection of welds (with camera).
Visual inspection of damage to pipes (with camera).
Visual inspection of strainers, clean if necessary (periods of high water temperature).
Visual inspection of zinc on pump and earthing.
Twice a year, the AKVA Subsea Feeder is taken out of the sea:
Control straps and ropes, and replace if required/worn.
Control metal components for corrosion and wear.
Check bolt connections.
Check plastic welds for cracks visually.
Clean the entire feeder.
* Clean the inside of the cyclone with a high pressure washer and/or brush. If grease deposits
are not removed regularly, it may cause densifications inside the AKVA Subsea Feeder. In such
case, the entire unit must be dismantled and cleaned inside.
DOCUMENT NO:
DOCUMENT PART:
DC10000901
10001800
REVISION NO:
C
16
16
20
of