Astrea Evolve AA20CRK Replacement Manual - Page 10
Browse online or download pdf Replacement Manual for Industrial Equipment Astrea Evolve AA20CRK. Astrea Evolve AA20CRK 19 pages. Wetted flow path for 200mm and 250mm chromatography columns
Figure 1.4 Photograph showing position of the support blocks before the fixing bolts are completely
4. Using the fixed end fixing tool and torque wrench, loosen each of the fixing bolts.
Remove the flowcell and place it on a clean work surface.
5. Locate the flats on the process flowtube and using the correct tool remove the flow tube.
6. To remove the mesh/seal assembly from the flowcell carefully prize the bed support seal
from the flowcell.
7. To exchange the flowcell it is necessary to locate the fixing bolts and using the correct
Allen key undo the fixing bolts and retain. Separate the flowcell from the backing plate.
Wetted Flowpath components Discarded
Sanitary clamp adaptor
Flowtube seal
Flowtube
Bottom Bed Support assembly
Bottom Flowcell and antijet
Pipespool elbow
Santoprene Ladish Seal
removed.
FIXED ASSEMBLY
Non-wetted components RETAINED
Pipespool clamp and fixing bolts
9
Fixed End
Support Block
Bottom Cell fixing screw
Cell Backing plate