Dover PSG Mouvex A80 Installation Operation & Maintenance - Page 13
Browse online or download pdf Installation Operation & Maintenance for Water Pump Dover PSG Mouvex A80. Dover PSG Mouvex A80 19 pages.
4. MAINTENANCE OPERATIONS (continous)
4.3.2 ASSEMBLING THE SHOES
1. Check that the shoes have no dents or deep scratches
that may quickly deteriorate the hose.
2. Position the screws 28 with their washer 29 around the
wheel 3.
3. Slip the special shims 4.
4. Positon the shoe 5.
5. Partially tighten the screws 28.
6. Insert a suitable number of shims in accordance with
the desired service pressure (see § SHIMMING THE
SHOES).
7. Tighten the screws 28, check that the shoe 5 is correct-
ly aligned with the wheel 3.
4
28
3
4.4 Setting of pump at service pressure needed
Shims may have to be added under the shoes (see §
SHIMMING THE SHOES).
The cover 2 need not be removed.
4.4.1 ADDING OR TAKING OFF SHIMS
First shoe :
1. Position the shoe 5 facing the window 15. If the shoe is
not correctly positioned, operate the pump intermit-
tently until the shoe 5 can be seen through the window
15.
2. Switch off the electric power supply before any opera-
tion in order to prevent the pump starting unexpected-
ly.
WARNING
DISCONNECT THE ELECTRICITY SUPPLY
BEFORE ANY MAINTENANCE OPERATION.
Dangerous voltage.
Can cause
injury and death
3. Drain the pump of his lubricant following the instruc-
tions of the § DISASSEMBLING THE HOSE.
NT 1101-L00 08.10 A80 - AS80 e
5
Wrong position of the shoe
29
Right position of the shoe
CAUTION
Slippery lubricant.
Spills should be
cleaned up.
4. Loosen the screws 37 and remove the washers 38.
5. Remove the window 15.
6. Remove the window seal 46.
7. Partially untighten the screws 28.
Do not loosen the shoe screws 28 completely.
8. Place the suitable number of shims 4 (see § SHIM-
MING THE SHOES).
9. Tighten the screws 28, check that the shoe 5 is correct-
ly aligned with the wheel 3 (see § ASSEMBLING THE
SHOES).
10. Check the window seal 46, change it if necessary.
11. Position the window 15 with its seal 46.
12. Tighten the screws 37, with their washers 38. Once
the screws are tightened, the seal must be squeezed
all over.
13. Switch on electric power supply.
Second shoe :
Repeat the previous steps from 1 to 13.
There must be the same number of shims under each
shoe.
13/19
THE PUMP LUBRICANT IS VERY SLIPPERY
AND MAY CAUSE SERIOUS INJURY.
ANY SPILLS MUST BE CLEANED UP.
NOTE
NOTE