Dover PSG Mouvex CENTREX MULTI 2M Installation Operation & Maintenance - Page 9

Browse online or download pdf Installation Operation & Maintenance for Water Pump Dover PSG Mouvex CENTREX MULTI 2M. Dover PSG Mouvex CENTREX MULTI 2M 11 pages.

Dover PSG Mouvex CENTREX MULTI 2M Installation Operation & Maintenance
Start the pump empty to check that the connections are
good and that the direction of rotation corresponds to the
system intake and discharge directions. If it is necessary
to reverse the direction of rotation, follow the instructions
below :
Three-phase motor : switch any 2 current input wires.
Ensure to remove the draining plug (side end motor shaft)
when installing the group definitively.
The equipment must be systematically stored in an area shel-
tered from bad weather.
The equipment must bear its original protective components
until it is installed in its final application.
WARNING
Toxic or hazardous
fluids can cause
serious injury.
NT 1006-C00 03 18 Centrex Multi 2 e
3. INSTALLATION (continued)

4. STORAGE CONDITIONS

5. PRODUCTS UNLOADED

IF PUMPING HAZARDOUS OR TOXIC
FLUIDS, THE SYSTEM MUST BE FLUS-
HED PRIOR TO PERFORMING ANY
SERVICE OPERATION.

3.8 Sealing of the unit

Refer to Instructions 1011-M00 HOW TO POSITION
WEDGES AND HOIST SCREW.
If installation is interrupted, put back in place the original pro-
tective components or equivalent components

5.1 Class of products and installation zone

Keep strictly to the recommendations made in the material
definition.
It is the responsibility of the installer to ensure that the
CENTREX MULTI 2 unit is compatible with the class of
products pumped as well as with the installation zone.
Use an ATEX unit where necessary.

5.2 Compatible products

• All products chemically compatible with the construction,
consult us if necessary.
• For example: Diesel, domestic heating oil, nonroad die-
sel, kerosene, Biofuel...
• Viscosity : see Instructions of the pump (NT 1010-D00) -
§ O
PERATING LIMITS
9/11
.