Follett Horizon Chewblet 710 Series Installation Instructions Manual - Page 5
Browse online or download pdf Installation Instructions Manual for Ice Maker Follett Horizon Chewblet 710 Series. Follett Horizon Chewblet 710 Series 17 pages. Models with ride technology
Prepare the installation site.
Provide drainage, water supply and electrical power to within 6 feet (2m) of ice
machine in accordance with local and national codes. Outdoor installation is
not recommended and will void warranty.
2.1
2.1
Installation site requirements
➍
2 ft. x 1" OD
silicone tubing
Electrical
➊
• H_C1010/1410 (A/W)VS 208-230/60
• H_E10101410 (A/W)VS 230/50
(H_E1010A/W requires 15A dedicated circuit 1.50 mm
‡ Plug must be provided by end user & must conform to standard EN 60 335-2-24 of the end destination.
Potable water supply
• 10-70 psi (69-483kpa)
• 45 to 90 F (7 to 32 C)
• Follett recommends the use of an in-line water filtration system (item# 00130286)
• This equipment is to be installed with adequate backflow protection to comply with applicable
federal, state, and local codes
Condenser water supply for water-cooled systems
• 10 psi min.; 150 psi max. (69kpa min.; 1034kpa max.)
• 45 to 90 F (7 to 32 C)
• 1.5 gallons per minute (5.68 liters per minute)
Drain
➍
(3/4" Barb)
• Minimum 8" radius on silicone drain line. Drain line from the ice machine must have at least
1/4" per foot pitch (6,4mm/0,3m).
VISION • RIDE Technology
3/4" barb x 3/4" FPT
3/4" MPT x 1" slip
1" PVC Drain
‡
➋
(3/8" push-in internal connection, 3/8" OD tubing required)
self-contained
H_C1010A/W
NEMA
6-15
➋
➌
➍
(6,4 mm per 0,3 m)
• H_D710AVS 115/60
Requires dedicated 15A circuit.
wire, H_E1410A/W requires 20A dedicated circuit 4.00 mm
2
➌
(1/4" FPT inlet, 1/4" FPT outlet)
Site preparation
H_D710A
NEMA
5-15
H_C1410A/W
NEMA
6-20
➊
H_E1010A/W
requires 15 amp circuit
1.50 mm
H_E1410A/W
requires 20 amp circuit
4.00 mm
➍
1/4" per foot
1'
wire)
2
2
‡
2
wire
‡
2
wire
5