Carbolite HTR 11/150 Installation, Operation & Maintenance Instructions Manual - Page 4

Browse online or download pdf Installation, Operation & Maintenance Instructions Manual for Industrial Equipment Carbolite HTR 11/150. Carbolite HTR 11/150 16 pages. 1100 degree c rotary reactors

Carbolite HTR 11/150 Installation, Operation & Maintenance Instructions Manual
HTR
2.5
Installing the Vessel
Silica vessel: see section 3.5. Handle the vessel with care.
The drive coupling assembly is fitted to the vessel as indicated in fig. 1, using the special spanner
provided. Slide the components into place, support part 2 firmly with the hand, and tighten part 1
with the spanner. Do not overtighten. The end of the vessel with this assembly fitted becomes the
left-hand end.
Lightly lubricate the drive coupling assembly and the furnace drive wheels, using 300°C grease.
Place the vessel onto the furnace by pushing it into the exhaust box on the right-hand side, and
lowering it onto the right-hand support wheels and the left-hand drive wheels.
Connect the left-hand end coupling according to fig. 2, using hand pressure only.
4
MF30 – 3.07