AMQ Activ Pro 2.0 Assembly Manual - Page 14

Browse online or download pdf Assembly Manual for Indoor Furnishing AMQ Activ Pro 2.0. AMQ Activ Pro 2.0 20 pages.

AMQ Activ Pro 2.0 Assembly Manual
Phase 7 | Attaching Wire Management
Step 1
Slide to both sides to open the cover of the
Wire Management.
Activ Pro 2.0 Assembly Guide | 14
Step 2
Double check to ensure that the Wire
Management is properly positioned on the
underside of the worksurface, and then attach
with wood screws.
Note: The Wire Management should be center
aligned with the worksurface width, and the Wire
Management centered between the Stretcher
Frame and the edge of the worksurface.
amqsolutions.com
ST5*25
(3)