Dr. Mach Mach 130F Mounting Instructions, Directions For Use - Page 3

Browse online or download pdf Mounting Instructions, Directions For Use for Dental equipment Dr. Mach Mach 130F. Dr. Mach Mach 130F 19 pages. Wall attachment

Dr. Mach Mach 130F Mounting Instructions, Directions For Use

Wall attachment Mach 120/130

Mach LED 120/130
Note:
The static (structural) inspection must be carried out before the installation of the
ceiling or wall anchorage!
The strength of the construction must be designed, checked and certified by a structural
-
engineer.
The respective regional construction regulations that apply must be followed.
-
If a wrong hole is drilled by mistake, e.g. drilling of a reinforcement rod, the structural
-
engineer who is responsible must be contacted, since adequate static load distribution in the
ceiling may have been endangered.
Declaration of acceptance:
It is hereby certified that the supporting ceiling / wall and the ceiling anchoring / wall anchoring
is safe and adequately strong.
Project
: ____________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
Anchoring
(please check the one that is applicable)
with dowels authorized by construction authority
-
with counter-plate
-
other
-
Location
: ____________________________________________
Signature / Stamp: (structural engineer / construction authority)
59860002
Static inspection
Edition 11
Dr. Mach
Lamps and Engineering
25.25.2011 / Bak Page 3/19