Bosch 8 Series Instruction Manual - Page 43

Browse online or download pdf Instruction Manual for Washer Bosch 8 Series. Bosch 8 Series 48 pages. Combi steam oven
Also for Bosch 8 Series: Installation Instructions Manual (21 pages), Assembly Instructions (4 pages), Instructions For Installation And Use Manual (16 pages), Quick Reference Manual (2 pages), User Manual And Installation Instructions (44 pages), Getting Started (7 pages), Instruction Manual (32 pages), User Manual And Installation Instructions (32 pages), Instruction Manual (12 pages), User Manual And Installation Instructions (24 pages), User Manual (28 pages), User Manual And Installation Instructions (28 pages), Instructions For Installation And Use Manual (20 pages), User Manual And Installation Instructions (44 pages), Instruction Manual (12 pages), User Manual And Installation Instructions (40 pages), User Manual And Installation Instructions (32 pages), Information For Use (20 pages)

Bosch 8 Series Instruction Manual

Delivery

Your dishwasher has been checked
thoroughly in the factory to ensure that
it is in working order. This may cause
small water stains. These will disappear
after the first wash cycle.

Technical specifications

Weight:
up to 60 kg
Voltage:
220–240 V, 50 Hz or 60 Hz
Connected load:
2.0 - 2.4 kW.
Fuse:
10/16 A (UK 13 A).
Power input:
off mode (Po)* 0,50 W.
left on mode (Pl)* 50 W.
*according to regulations (EU) nos.
1016/2010 and 1059/2010.
Additional functions and settings
may increase the power input.
Water pressure:
at least 0.05 MPa (0.5 bar),
maximum 1 MPa (10 bar).
At a higher water pressure:
connect pressure-reducing valve
ahead.
Inlet rate:
minimum 10 litres/minute
Water temperature:
cold water.
Hot water:
Maximum temperature 60 °C.
Capacity:
12–15 place settings (depending on
the features of your dishwasher).
Installation and connection en

Installation

The required installation dimensions
can be found in the installation
instructions. Level the appliance with
the aid of the height-adjustable feet.
Ensure that the appliance is situated
securely on the floor.
A built-under or integrated appliance
which is installed subsequently as a
free-standing appliance must be
secured to prevent it from
overturning, e.g. by screwing it to the
wall or by installing it under a
continuous worktop which is
screwed to adjacent cupboards.
The appliance can easily be installed
in a fitted kitchen between wooden
and plastic walls.

Drainage connection

The required work sequence can be
1.
found in the installation instructions.
If required, fit a siphon with an
drainage connection.
Connect the waste-water hose
2.
to the drainage
connection of the siphon with
the enclosed parts.
Ensure that the drainage hose is not
kinked, crushed or twisted and that
there is no cover
plate in the drainage to prevent
the waste water from flowing out!
43