Draper Acumen Recharge E Instructions Installation & Operation - Page 6
Browse online or download pdf Instructions Installation & Operation for Projection Screen Draper Acumen Recharge E. Draper Acumen Recharge E 12 pages. Battery operated electric projection screen
Acumen
Recharge E & V
™
Section 5 - Wake Up Motor
Each Acumen ReCharge battery motor will come preprogramed from Draper.
Upon leaving the factory the motor is placed into "Sleep Mode" to avoid accidental operation during shipping.
It is necessary to "Wake" the motor before operation and setup.
1. To "Wake" the motor and exit Sleep Mode assure the screen is mounted on the wall or ceiling.
2. Plug charging cable into motor and plug cable into a 110V wall outlet
3. The motor is now no longer in "Sleep Mode" and ready for further setup.
Handheld remote will operate screen out of the box. Limits are set at the factory.
Section 6 - Handheld Remote Control
Section 7 - Check Battery Charge Level
1. Move screen to UPPER LIMIT/
2. Hold the UP button on the remote for 5 Seconds.
HOLD
APPROX.
3. Screen moves to percentage of battery charge remaining.
(Exiting Sleep Mode)
e
(see Section 6 - page 6)
FRONT
SETTINGS
Single Channel
RF Remote
5
SECS
5
SEC S
.
BACK
UP
STOP
DOWN
Battery Compartment
(Shown with cover removed)
ACUMEN RECHARGE
page 6 of 12
Please Note: Programming button will face down.
AT UPPER LIMIT
HALFWAY DOWN
AT LOWER LIMIT
0%
50%
100%