Draper Clarion Assembly/Mounting Instructions - Page 2

Browse online or download pdf Assembly/Mounting Instructions for Projection Screen Draper Clarion. Draper Clarion 3 pages. Permanently tensioned projection screen
Also for Draper Clarion: Assembly/Mounting Instructions (2 pages), Assembly/Mounting Instructions (4 pages), Assembly/Mounting Instructions (4 pages), Assembly/Mounting Instructions (2 pages)

Draper Clarion Assembly/Mounting Instructions
Curved Clarion by Draper
Surface Preparation
1 Move frame assembly out of the way, unroll viewing surface and place on
smooth/clean surface. (Orient viewing surface so that folded side of hem is
visible.)
2 Insert plastic tubing inside pocket formed by hem on all 4 edges of viewing
surface (see Fig. 6).
3 Divide surface retention extrusions up so they will be evenly spaced all the
way around the screen.
4 Carefully slide surface retention extrusions (rounded edge visible) along
hem and onto surface on all 4 edges of fabric (see Fig. 7).
not allow fabric to snag on ends of extrusions. If the screen
fabric is not parallel with the surface retention extrusion, then
it may slit and tear during installation.
Please Note: To make this step easier, pinch the end of the pocket closed
before sliding it into the surface retention extrusions.
Surface Retention
Extrusion
Back of
Viewing Surface
5 The top and bottom of the screen should have the same number of
surface retention extrusions. The two sides should also have the same
number. This will allow even spacing all the way around the screen.
6 Verify that all surface retention extrusions are installed with rounded edge
visible and are centered on surface material.
Surface to Frame Assembly
1 Return frame onto clean surface, face down, and drape completed surface
assembly over completed frame profile with rounded edges of surface
retention extrusions visible.
2 Hook surface retention extrusions on any side of surface to notch #2 on
corresponding side of frame extrusion (see Fig. 8).
Viewing Surface
Notch #1
Fabric Attachment Extrusions
Figure 6
Caution: Do
Plastic Tubing
Back of
Viewing Surface
Figure 7
Surface Retention Extrusion
Notch #2
Figure 8
www.draperinc.com
3 Repeat on opposite side of surface, again using notch #2.
4 Repeat steps 2-3 with remaining edges of surface.
5 Ensure surface retention extrusions are centered lengthwise in tension
slots on all 4 edges of surface.
6 If additional tension in certain areas of the screen is desired, adjust surface
retention extrusions to notch #1 as necessary.
Please Note: It is not necessary to adjust more than one edge at a time to
increase surface tension.
Corner Reinforcement Kit (Part No. 252154)
1 If screen is being flown (suspended) or is over 120" (viewing area) height
or width, install Corner reinforcement Gussets to all four corners (see Fig.
9).
Mounting Screen to Wall
1 Determine height at which screen is to be mounted.
Please Note: Top edge of screen frame will be located ½" above mounting
bracket hole centerline when mounted to wall.
2 Mark hole centerline so that brackets can be mounted parallel and at equal
height.
3 Install brackets so that the outermost edges are safely within the overall
length of the aluminum frame extrusion to allow for minor horizontal screen
adjustments (hardware for mounting brackets to wall is not supplied).
4 The bottom center bracket on the Curved Onyx acts as a locking bracket.
Slide the center plate up, then push the screen back against the wall,
releasing the center plate. The tongue on the center plate will then slide
down into the frame extrusion, locking the frame in place.
4 Position screen slightly above brackets on wall.
Please Note: When lifting screen, do not lift at only one corner; lift at
both corners. Lifting by one corner could result in damage to the screen
frame, especially on large screens.
5 Lower screen onto brackets.
Clarion Brackets
Outer Brackets
C501.321
C501.322
C501.323
(765) 987-7999
Page 2 of 3
Figure 9
Center Brackets
Top
C264.047SA
Bottom
(locking)
C264.048SA