Draper FlexShade Instructions Installation & Operation - Page 4

Browse online or download pdf Instructions Installation & Operation for Projection Screen Draper FlexShade. Draper FlexShade 12 pages. Exterior clutch-operated shade
Also for Draper FlexShade: Installation & Operation Manual (8 pages), Installation Instructions (2 pages), Instructions Manual (12 pages), Installation & Operation Instructions (11 pages), Instructions Installation & Operation (16 pages), Instructions Installation & Operation (4 pages), Instructions Manual (7 pages), Instructions Installation & Operation (12 pages), Instructions Installation & Operation (16 pages)

Draper FlexShade Instructions Installation & Operation
Dual Roller Coupled Motorized FlexShade

Section 3 - Pocket Headbox Installation

Please Note: Installer must provide adequate clearance for removal of
Roller Assembly during installation and maintenance.
Please Note: Headbox must be mounted directly to ceiling, or to a
continuous blocking that is secured to building structure.
Figure 3-B
1.
2.
Mark location of optional
pre-drilled pocket
mounting holes and
endcap mounting holes
on top side of headbox
on mounting surface.
Figure 3-D
Brackets mounted
to continuous
blocking (by others)
secured to
building
structure.
Lift headbox into
mounting position.
A.
®
(Extra Large Hardware)
Figure 3-A
Figure 3-C
3.
Drill small
starter hole
(if necessary)
in mounting
surface.
5.
Mount endcaps using appropriate
fasteners for surface
6.
Mount pocket closure.
.
(Fig. 3-D)
3"
Headbox
(76mm)
Closure
Clip
Panel
(With
optional
tile support)
B.
Ceiling
(by others)
page 4 of 12
4.
Mount pocket
headbox using
appropriate
fasteners for
surface.
.
(Section 1)
OR
3"
Headbox
(76mm)
Closure
Clip
Panel
(Without
optional
tile support)
OR