Draper Foundation Installation Manual - Page 12
Browse online or download pdf Installation Manual for Projection Screen Draper Foundation. Draper Foundation 17 pages. Foundation for led panels
Foundation
for LED Panels
™
Section 11.2 - X - Axis Adjustment
(Squaring Verticals with provided Alignment Tool)
Section 11.2.1 - For LED arrays up to 6 panels high - 2 Horizontal Rails
1. Shine a laser line at the left edge of the
Adjust Vertical
structure and check that the first Vertical
Rails Until
Rail is square with the floor. To adjust,
loosen the fasteners installed in Section 10,
Plum with
Step 3 and slide the Vertical Rail along the
Laser Line
Horizontal Rail until. Tighten fasteners when
the first vertical is square.
2. Attach the two
(2)
alignment tools to the vertical rail positioned
in step 1.
Using Side A of the alignment tool insert the pins into the
corresponding alignment holes on the first vertical rail at
the top and bottom locations.
3. Adjust the position of the next vertical rail in order for the
alignment pin on each tool to align with the corresponding
alignment hole in the vertical rail.
4. Tighten the second vertical rail mounting screws.
Note: Use
Side A
of the alignment tool for the last vertical rail alignment procedure.
Left End
Inner
OUTER LED
Vertical
Vertical
Rail
COLUMN
17"
433mm
page 22 of 32
OUTER LED
OUTER LED
INNER LED
INNER LED
COLUMN
COLUMN
COLUMNS
COLUMNS
Inner
INNER LED
Vertical
COLUMNS
Rail
Rail
19
/
"
3
8
493mm
Foundation
Section 11.2.2 - For LED arrays 7 panels or higher - 3 Horizontal Rails
1. Shine a laser line at the left edge of the structure and check that the first Vertical Rail is square with the floor. To adjust, loosen the fasteners installed in
Section 10, Step 3 and slide the Vertical Rail along the Horizontal Rail until. Tighten fasteners when the first vertical is square.
2. Attach the 2 alignment tools to the vertical rail positioned in step 1.
Using Side A of the alignment tool insert the pins into the corresponding alignment holes
on the first vertical rail at the top and bottom locations.
3. Adjust the position of the next vertical rail in order for the alignment pin on each tool to align
with the corresponding alignment hole in the vertical rail.
OUTER LED
OUTER LED
COLUMN
COLUMN
4. Tighten the second vertical rail mounting screws.
5. Remove alignment tools and re-attach each using side B to the 3rd vertical rail using the corresponding alignment holes at the top and bottom of the rail.
6. Adjust the position of the 3rd vertical rail so that the pin on the end of the tool aligns with the corresponding hole on the 2nd vertical rail.
7. Tighten the mounting screws on the 3rd mounting rail and repeat the process moving across the structure from left to right.
Adjust Vertical
Rails Until
OUTER LED
OUTER LED
COLUMN
COLUMN
Plum with
Laser Line
Left End
Vertical
Rail
for LED Panels
™
INNER LED
INNER LED
COLUMNS
COLUMNS
NOTE: 2 LED Alignment Tools are provided. Mutiple placements are shown.
Inner
INNER LED
OUTER LED
Vertical
COLUMN
Rail
COLUMNS
17"
19
433mm
493mm
page 23 of 32
INNER LED
INNER LED
OUTER LED
OUTER LED
COLUMNS
COLUMNS
COLUMN
COLUMN
Inner
Vertical
Rail
/
"
3
8