Draper Profile+ Assembly/Mounting Instructions - Page 3

Browse online or download pdf Assembly/Mounting Instructions for Projection Screen Draper Profile+. Draper Profile+ 3 pages. Permanently tensioned projection screen

Profile
Permanently Tensioned Projection Screen
Trim Frame Attachment
1. Snap the trim frame corners onto all four (4) corners.
Adjust the fabric if needed (See fig. 6).
Figure
(6)
Mounting On the Wall
1. Mount the Wall Brackets in the desired location. They must be installed level and have at least 2 fasteners (by others) per bracket.
2. Lift the assembled screen up and over the wall brackets. The screen will align with the channel in the frame.
3. Carefully let the screen settle on the wall brackets.
Wall Mounting
Bracket
Wall
Mounting
Bracket
Mounting
Hardware
(by Others)
* Please Note:
Mounting bracket fasteners must
be positioned at least 4 ½" below
the ceiling or overhead structure.
(1)
(2)
Ceiling or Overhead
Obstruction
4 ½"*
www.draperinc.com
2. Snap the trim frame sections onto all four (4) sides of the frame.
Adjust the fabric if needed (See fig. 7).
Ceiling or Overhead
Obstruction
Screen Frame
Side View
Lift Screen
Up & Over
Wall Brackets
It will align
with the Channel
in the Frame
(765) 987-7999
Figure
(3)
Ceiling or Overhead
Obstruction
¾"
Screen Frame
Side View
Screen Frame
Properly Installed
Page 3 of 4
(7)
3 ¾"