Draper Signature E Series Installation & Operating Instructions - Page 2

Browse online or download pdf Installation & Operating Instructions for Projection Screen Draper Signature E Series. Draper Signature E Series 2 pages. Electric projection screen
Also for Draper Signature E Series: Installation & Operating Instructions (2 pages), Installation & Operating Instructions (2 pages), Installation & Operating Instructions (2 pages)

Draper Signature E Series Installation & Operating Instructions
Signature/Series E & V by DRAPER
1
1
/
" Typ
2
Case length
Viewing surface
1
2
/
"
8
NOTE: Viewing surface shown is Series V with tab tensioning.
Series E, without tab tensioning, is also available.
Case Style "S"
Audience
Ceiling Tile and grid
(by others)
Case Style "L"
1
Shown with
/
"
2
threaded rod (by
others). Other
7"
mounting hardware
options feasible.
11"
Electrical connection
to internal splice box
7
on left end of case.
/
"
8
1
1
knockout for
/
" conduit.
9
/
2
8
J-Box cover located under
splice box.
SCREEN SIZE
Total Drop <148" or viewing width <144"
Total drop >148" or viewing width >144"
If you encounter any difficulties installing or servicing your Signature/Series E or V,
call your dealer or Draper, Inc., Spiceland, Ind., (765) 987-7999, fax (765) 987-7142,
Case Dimensions & Methds of Installation
Ceiling grid and
tile (by others)
3
Shown with
/
"
8
threaded rod (by
others). Other
7"
mounting hardware
options feasible.
3
9
/
"
4
Electrical connection
to internal splice box
7
on right end of case.
/
"
8
9
1
/
"
knockout for
1
/
" conduit.
8
2
J-Box cover located under
splice box.
Audience
"
Ceiling Tile and grid
(by others)
CASE STYLE
"S"
"L"
Tab-Tension Adjustment
Procedure for Signature/Series V
➀ Determine which side requires adjustment.
➁ Secure dowel with one hand.
Caution: Do not touch or bend surface.
➂ Using Philips-head screwdriver, depress
spring-loaded adjustment screw (see
drawing) and slowly turn clockwise to
tighten tension, or counterclockwise
to loosen tension. The screw adjusts
in ¼ turn increments. Adjust only one
increment (¼ turn).
➃ If problem is not corrected, leave screen in
position for 24 hours to allow surface
material to stretch into position.
➄ If problem still is not corrected, repeat steps
2 and 3.
Wiring Diagrams
Single Station Control
Internal Screen Wiring
White (Common)
Black (Down)
Red (Up)
Green (Ground)
Dashed wiring
by electrician
Single gang box by others
Control
1
Min. 4" x 2
/
" x 1
switch
8
Blue
Red
Black
Location of key
operated on-off
switch if furnished
To 110-120V Line
Low Voltage (& Wireless) Control Wiring Diagram
Control
Switches
Low Voltage Control Module
24v DC
Black (DN)
Black (DN)
Red (UP)
Red (UP)
STOP
White (COM)
White (COM)
Black (DN)
Red (UP)
STOP
White (COM)
Optional
Radio
Receiver
Package
Dowel
Multiple Station Control
Red
7
/
" deep
8
Black
Red
Black
Red
Black
Location of key
operated on-off
switch if furnished
To 110-120V Line
Black
White
Red
White
Red
Brown
Black
Yellow
Green
Optional Infrared
Dashed wiring by electrician
Receiver Package
Location of key
operated on-off
switch if furnished
To 110-120V Line
Page 2 of 2
Tensioning
Cable
Adjustment
Screw
Internal Screen Wiring
White (Common)
Black (Down)
Red (Up)
Green (Ground)
Cap off with wire
nut and tape
Blue
Dashed wiring
by electrician
Blue
Blue
Single gang box by others
1
7
Min. 4" x 2
/
" x 1
/
" deep.
8
8
3 shown. More or less equally
feasible.
Internal Screen Wiring
White (Common)
Red (Up)
Black (Down)
Green (Ground)