Draper FlexShade NEXD Instructions Manual - Page 5

Browse online or download pdf Instructions Manual for Indoor Furnishing Draper FlexShade NEXD. Draper FlexShade NEXD 12 pages. Clutch-operated small and large hardware
Also for Draper FlexShade NEXD: Installation & Operation Instructions (6 pages), Instructions Installation & Operation (8 pages), Instructions Manual (8 pages), Instructions Installation & Operation (8 pages), Instructions Installation & Operation (10 pages)

Draper FlexShade NEXD Instructions Manual
Dual Roller FlexShade

Section 3 - Dual Roller Surface Headbox Installation

Figure 4-A
2.
Using pre-drilled
holes in endcaps,
mark headbox for
drilling.
Figure 4-C
I D L
E R
E N D
C A P
& C
O V E
NEXD
®
1.
Place endcaps into
top/back cover
piece of ceiling/wall
headbox.
Please Note: Installer
must provide adequate
clearance for removal
of Roller Assembly
during installation and
maintenance.
R
Figure 4-B
3.
Please Note: Headbox MUST BE mounted directly to
ceiling or wall, or to a continuous blocking that has
been secured to building structure.
O P E
E N D
R A T
C A P
O R
& C
O V E
R
4.
Attach endcaps and top/back
cover piece to wall or ceiling,
using mounting hardware
appropriate for site conditions.
Next, mount roller assemblies
(Section 5)
page 5 of 12
Drill holes in back
or top
(wall mount)
of top/
(ceiling mount)
back cover piece.
.