Draper LightBloc ZIP 127 Installation & Operation Instructions - Page 6
Browse online or download pdf Installation & Operation Instructions for Indoor Furnishing Draper LightBloc ZIP 127. Draper LightBloc ZIP 127 12 pages.
LightBloc ZIP™ 92 & ZIP 127
Section 6 - Mounting Angled Headbox
Please Note: Steps 1-5 of Section 5
It is critical that the full length of each Side Channel is secured to the mounting surface.
The Angled Headbox can be mounted permanently to wall or ceiling
can rest atop Side Channels and held in place by two mounting studs coming down from endcaps.
1.
Remove screws from bottom of Headbox.
Remove Fascia and set aside.
2.
Verify cable
routing
(Section 14)
Section 7 - Mounting Headbox in a Recessed Pocket
LightBloc ZIP™ can also be installed in a pocket in ceiling.
Please Note: Be sure to provide adequate clearance for removal of Roller Assembly during installation and maintenance.
Minimum depth of ceiling pocket is 6 ¼"
LightBloc ZIP 92
4 "
min. 1
(32mm)
min. 6 "
(159mm)
(Installing Side Channels)
REMOVE
FASCIA
.
.
(159mm)
(121mm)
3 "
(92mm)
3 "
(92mm)
5 "
(149mm)
must be completed before mounting the Angled Headbox.
(See Section 4 - Direct Mounting to Ceiling or Wall)
S i d
C h
e
a n n
e l
4.
Insert Headbox
mounting stud into
Side Channel.
(Optional)
min. 1
(32mm)
min. 6 "
(159mm)
3.
Insert "Zipper" on one side of
Hem Bar into fabric retainer in
Side Channels.
S i d
C h a
e
n n e
l
5.
Reinsert Fabric Retainer Strips into
Side Channels and re-attach Covers.
6.
Assembly complete. Proceed to
Section 11 or 12 for limit setting.
LightBloc ZIP 127
6 "
(159mm)
5"
(127mm)
page 6 of 12
; or Headbox
ZIPPER
HEM
BAR
FABRIC
RETAINER
STRIP
5"
(127mm)
7 "
(184mm)